ТУК.
ТУК.
ՏՈՒԿ.
ՏՈՒԿ.
TUK.
TUK.
ՏՈՒԿ.
ՏՈՒԿ.
租赁
出售
日租
新楼盘
房屋与地块
商业地产
房贷
我的家
+ 发布房源
登录
地图搜索房贷计算器网站规则价格与推广+ 免费发布
出售租赁日租新楼盘房屋与地块商业地产
房贷与计算器地图搜索《我的家》杂志收藏
关于图克图克联系方式价格与推广“图克印记”计划网站广告帮助中心
用户协议隐私政策公开要约公司信息与联系方式房源发布规则
图克图克 — 亚美尼亚房产信息平台:买卖、租赁、新房、商业地产。 · © 2026 tuk-tuk · 一年以上: MET Norway (CC BY 4.0)
首页
搜索
收藏
消息
登录
我的家 · 装修与设计

A new-build apartment without finishing: how to accept it from the developer and start renovating

tt
Редакция tuk-tuk
2 九月 2026 · 阅读约 4 分钟
The keys to a flat in a new building mark the start of the renovation, not the end. Here is what to check at handover, how to record defects and in what order to do the finishing.

What “without finishing” means

There is no single standard. For one developer “without finishing” means bare concrete walls and slabs; for another it means plastered walls, a floor screed and electrical wiring. What exactly the developer must deliver is set out in your contract and its annexes: the technical description of the apartment, the floor plan and the list of works. Check against these documents, not the sales brochure.

Handover: what to check

Bring the contract with its annexes, the floor plan, a tape measure, a spirit level, a torch and a charged phone for photos. If you can, invite an independent builder or engineer: they will spot what a non-specialist misses.
  • Floor area and layout match the contract
  • Walls and ceilings: cracks, noticeable deviations from level
  • Floor screed, if any: cracks and hollow spots (tap it)
  • Windows and balcony door: open and close properly, no draughts, glazing units and seals intact
  • Front door and locks
  • Electrics: the panel, number and position of points as per the design
  • Water and sewage: outlets, caps, no signs of leaks
  • Heating and gas — if the contract says they are connected
  • Ventilation: is there draught in the kitchen and bathroom ducts
  • Meters and their readings on the day of handover

How to record defects

Write every remark into the handover certificate or a separate list of defects signed by both parties. The logic of Armenia’s Civil Code is that defects visible during a normal inspection but not recorded at handover are hard to prove later. So write everything down, even small things.
Find out the warranty period separately — it should be stated in the contract. If a sale contract sets no warranty period, the Civil Code allows the buyer to claim for defects discovered within a reasonable time, and within no less than two years after handover. Ask a lawyer or notary which rules apply to your particular contract with the developer.
Tuk 的建议
Photograph every defect next to a tape measure or level and send it to the developer in writing — by email or formal letter. A verbal “we’ll fix it next week” is no use in a dispute.

Documents

Once the building is commissioned, ownership is registered with the Cadastre. Don’t put registration off until after the renovation: until your title is registered you cannot fully dispose of the apartment — sell it, gift it or mortgage it. More on registration in the Documents and Cadastre section.

Where to start the renovation

Interior finishing inside an apartment needs no construction permit. But don’t rush into expensive finishes: in the first months a new building may show cracks from drying and settlement — better they appear before the tiles and wallpaper go on.
  • 1
    Design: furniture layout, sockets, lighting, plumbing
  • 2
    Rough works: partitions (non-load-bearing only and according to the plan), wiring, plumbing
  • 3
    Plaster and screed, if the developer did not do them
  • 4
    Windows and reveals, if you need replacement or insulation (in Yerevan changes to external windows are approved by the municipality)
  • 5
    Finishing: tiles, floors, paint
  • 6
    Kitchen, furniture, light fittings
Remember: the building’s load-bearing structures are the common property of all owners. They must not be weakened, even if a column really gets in the way of your future kitchen. And agree on rules with the neighbours: in a new building almost everyone renovates at the same time, and shared rules on noisy hours benefit everyone.
Tuk 的建议
While the walls are open, photograph the wiring and pipe runs next to a tape measure. Years later, when you hang a shelf, these photos will save you from drilling into a cable.
Choosing a flat in a new building? New-build apartments in tuk-tuk search, with filters and on the map.
View new builds

Key points

  • “Without finishing” means whatever your contract and its annexes say
  • Go to the handover with the plan, tools and ideally a specialist
  • Record every defect in the certificate or a written list with photos
  • Find out the warranty period and don’t delay Cadastre registration
  • Leave load-bearing structures alone and start the renovation with a design
来源
•
Гражданский кодекс РА — arlis.am
•
Гражданский кодекс РА, русский перевод — Центр переводов
•
Закон РА «Об управлении многоквартирным домом» — arlis.am
•
Hartak.am — Как получить разрешения на застройку
这篇文章有用吗?
#new build
#apartment handover
#renovation
#developer
Telegram
WhatsApp
Viber
Facebook
本文仅供参考。法律、收费标准和银行条件会变化 — 交易前请向公证人、地籍局、银行或税务机关核实细节。
目录
What “without finishing” meansHandover: what to checkHow to record defectsDocumentsWhere to start the renovationKey points
Selling a flat?
Attach a Cadastre extract and get the “Verified” badge
Post for free

可能适合您

45 000 000 ֏
≈ $116 279
公寓 · 2 室 · 54 ㎡ · 2/9 · 阿万区
亚美尼亚的房产经纪人
38 000 000 ֏
≈ $98 191
公寓 · 2 室 · 52 ㎡ · 3/9 · 阿万区
面向业主
41 000 000 ֏
≈ $105 943
公寓 · 2 室 · 55 ㎡ · 9/16 · 达夫塔申区
面向业主
95 000 000 ֏
≈ $245 478
公寓 · 3 室 · 100 ㎡ · 8/14 · 肯特隆区
亚美尼亚的房产经纪人

相关阅读

装修与设计
装修与设计
How to choose tradespeople and not overpay
9 九月 · 4 分钟
装修与设计
Heating your apartment in winter: gas boiler, air conditioner or heaters
26 八月 · 4 分钟
装修与设计
A Yerevan apartment interior: light, tuff and summer heat
12 八月 · 4 分钟