ТУК.
ТУК.
ՏՈՒԿ.
ՏՈՒԿ.
TUK.
TUK.
ՏՈՒԿ.
ՏՈՒԿ.
租赁
出售
日租
新楼盘
房屋与地块
商业地产
房贷
我的家
+ 发布房源
登录
地图搜索房贷计算器网站规则价格与推广+ 免费发布
出售租赁日租新楼盘房屋与地块商业地产
房贷与计算器地图搜索《我的家》杂志收藏
关于图克图克联系方式价格与推广“图克印记”计划网站广告帮助中心
用户协议隐私政策公开要约公司信息与联系方式房源发布规则
图克图克 — 亚美尼亚房产信息平台:买卖、租赁、新房、商业地产。 · © 2026 tuk-tuk · 一年以上: MET Norway (CC BY 4.0)
首页
搜索
收藏
消息
登录
我的家 · 房屋与地块

Rezoning land for construction: when is it possible?

tt
Редакция tuk-tuk
28 八月 2026 · 阅读约 4 分钟
Agricultural plots are often cheaper, and it is tempting to buy one and “rezone it later”. Here is how changing a plot's designation works and why it should never be treated as a formality.

What changes

Every plot has a designated purpose (a land category) and a functional designation. Rezoning for construction means changing these, for example from agricultural land to settlement land for residential development. Until the designation is changed, you generally cannot build a house on agricultural land: the Land Code requires land to be used as designated, and an unauthorised change of designation is grounds for a court to invalidate the decisions and transactions related to the plot.
The designation also decides whether you can get a building permit. For example, the simplified procedure for private houses in force since 1 June 2026 applies only to plots designated for residential development. So before buying a plot, decide what you want to build on it and check whether its designation allows that today, not someday.

The key condition: the community master plan

The community's spatial planning documents, above all the master plan, play the decisive role. The procedure for changing a designation is set out in Government Decision No. 1920-N of 29 December 2011.
  • 1
    The owner submits an application in the prescribed form to the community head, stating the plot's current designation and the one it should be changed to.
  • 2
    If the master plan or another planning document already provides for the required designation, the community head decides on the change within three working days.
  • 3
    If the master plan provides for a different designation, the matter goes through the marzpetaran (regional administration) to the authorised state body; in effect, this means amending the master plan.
  • 4
    After the decision, check that the new designation appears in a fresh Cadastre extract.
Amending the master plan for a single plot requires a full package: the owner's application, an excerpt from the cadastral map or an orthophoto showing the surroundings, confirmation that utility connections are possible, the community head's justification and photographs. This route takes much longer than the first and guarantees nothing. In practice such cases can drag on for years, and all that time the plot stays agricultural and your money stays frozen.
Tuk 的建议
Before buying an agricultural plot “for a house”, go to the community office and ask to see the master plan for that location. If the required designation is already there, the change will be far easier.

What it costs

If the plot's cadastral value rises after the change, the owner pays the difference between the cadastral values at the time of the change into the community budget within three months (Land Code, Article 7). Near a city, where building land costs much more than farmland, the sum can be substantial, so ask the community or the Cadastre to estimate it in advance.
The Code also protects valuable farmland: converting higher-value agricultural land to a lower-value type requires the community head's permission. On top of that, budget for preparing documents, surveying and future utility connections. Add these costs up and compare the total with the price of a ready building plot nearby; the difference is often smaller than it seemed.

When the chances are better or worse

SituationOutlook
The master plan already provides for residential development on the plotGood: the community head decides quickly
The plot is on the edge of a village with houses, a road and utilities nearbyPossible, but the master plan may need amending
The plot is in the middle of fields with no road or utilitiesPoor: development is hard to justify
Specially protected, forest or water landAs a rule, not suitable for a private house
Tuk 的建议
The safest option is for the seller to change the designation before the sale. Then you buy a plot that is already ready for a house and your money is not at risk.
Land on tuk-tuk Search plots across Armenia with filters and on the map. The “Verified” badge marks listings with a Cadastre extract.
View land

Key takeaways

  • You can build a house only on land with a suitable designation; an unauthorised change can get transactions invalidated in court.
  • The master plan decides everything: if it already has the required designation, the community head decides within three working days.
  • If the master plan says otherwise, the route runs through the marzpetaran and a state body, which is slow and uncertain.
  • If the cadastral value rises, the owner pays the difference into the community budget within three months.
  • It is better to buy a plot whose designation has already been changed.
来源
•
ARLIS — Земельный кодекс РА
•
ARLIS — постановление правительства РА № 1920-Н от 29.12.2011 о порядке разработки и изменения генпланов и смене назначения участков
•
Арменпресс — упрощённый порядок строительства индивидуальных жилых домов (Комитет по градостроительству)
这篇文章有用吗?
#land designation
#rezoning
#master plan
#land plot
Telegram
WhatsApp
Viber
Facebook
本文仅供参考。法律、收费标准和银行条件会变化 — 交易前请向公证人、地籍局、银行或税务机关核实细节。
目录
What changesThe key condition: the community master planWhat it costsWhen the chances are better or worseKey takeaways
Selling a flat?
Attach a Cadastre extract and get the “Verified” badge
Post for free

可能适合您

13 500 000 ֏
≈ $34 884
地块 · 7 公顷 · 迪利然
亚美尼亚的房产经纪人
21 200 000 ֏
≈ $54 780
地块 · 10 公顷 · 马拉蒂亚-塞巴斯蒂亚区
面向业主
13 300 000 ֏
≈ $34 367
地块 · 9 公顷 · 马拉蒂亚-塞巴斯蒂亚区
开发商:
13 800 000 ֏
≈ $35 659
地块 · 10 公顷 · 塞凡
亚美尼亚的中介机构

相关阅读

房屋与地块
房屋与地块
Part of a house: how to buy and register it
11 九月 · 4 分钟
房屋与地块
Yerevan suburbs: living in Kotayk, the pros and cons
8 九月 · 3 分钟
房屋与地块
Water, gas and electricity: how to check and connect utilities
5 九月 · 4 分钟