Building permit for a house in Armenia: how to get one

tt
Редакция tuk-tuk
8 七月 2026 · 阅读约 4 分钟
You can build a house on your own land legally and without running from office to office: since 2025 permits are issued only online, and since 1 June 2026 a simplified procedure applies to small private houses.

When you need a permit

Building a residential house requires a construction permit. It is issued by the head of the community where the plot is located. Building without one is risky: as a rule, such a house cannot be registered with the Cadastre, which makes it hard to sell, mortgage or pass on through inheritance.
The procedure for development permits is set by Government Decision No. 596-N of 19 March 2015. Which minor works can be done without a permit depends on the type of work and changes over time, so check with the community architect before you start.

Everything goes through urban.e-gov.am

According to the Urban Development Committee, since 1 January 2025 the whole process of obtaining development permits in every province and in Yerevan has been electronic only, through the urban.e-gov.am platform. You no longer file paper applications at the community office: the platform is used at every stage, from the design assignment to the paperwork for a finished building.

The standard procedure, step by step

  • 1
    Check the plot: ownership, land designation (it must be residential development), restrictions and protection zones.
  • 2
    Obtain an architectural and planning assignment, a document in which the community sets the requirements for building on the plot.
  • 3
    Obtain technical conditions for connecting to water, gas and electricity.
  • 4
    Commission a design from an organisation licensed to do design work.
  • 5
    Have the design reviewed by experts if your project requires it.
  • 6
    Submit the design and receive the construction permit from the community head.
  • 7
    Build the house under technical supervision of construction quality.
  • 8
    Complete the paperwork for the finished building and register the house with the Cadastre Committee.

The simplified procedure from 1 June 2026

Government Decision No. 1969-N of 25 December 2025 introduced a simplified procedure for individual residential houses of Category II (medium risk) built for non-commercial purposes. It took effect on 1 June 2026.
According to the Urban Development Committee, the simplified procedure applies if:
  • the house is no larger than 300 m², with up to two floors above ground and one below;
  • auxiliary buildings are no larger than 50 m²;
  • the plot is owned by a citizen and designated for residential development;
  • the house is built for your own use, not for sale or business.
What changes: the expert review of the design is replaced by a guarantee letter from the design organisation confirming that the design complies with the law, and technical supervision of construction quality is replaced by a technical inspection report. You can take a ready-made standard design published on the Urban Development Committee's website minurban.am, which has already passed expert review, and simply adapt it to your plot. If the community head misses the deadline, the committee says the platform will issue the document automatically.
Tuk 的建议
Before commissioning a design, look at the standard designs on the Urban Development Committee's website. A ready solution that has already passed expert review saves both time and money.

How much it costs and how long it takes

Exact amounts and timelines depend on the community, the building and the procedure you use. Permit duties and local fees are set by law and by the community council; the cost of the design is set by the market. Before buying a plot to build on, ask the community how much the planning assignment and permit cost and how long they usually take.
  • A Cadastre extract for the plot.
  • An identity document to log in to the platform.
  • Technical conditions from the water, gas and electricity suppliers.
  • A design, or a standard design adapted to the plot.
  • A contract with the builder and, if needed, with the technical supervisor.
Tuk 的建议
Keep every decision, the design, the reports and all correspondence about the build in one folder. They will be the first things asked for when you register, sell or mortgage the house.
Plots to build on Find a plot on tuk-tuk: filters, map search and a “Verified” badge on listings with a Cadastre extract.
View land

Key takeaways

  • A house building permit is issued by the community head; since 2025 everything is done online through urban.e-gov.am.
  • The standard route: planning assignment, technical conditions, design, expert review (if required), permit, supervision, completion paperwork and registration.
  • Since 1 June 2026 a simplified procedure applies to houses up to 300 m² on your own land designated for residential development.
  • Check costs and timelines with your community before you buy a plot.
来源
•
E-gov.am — постановление правительства РА № 1969-Н от 25.12.2025 (упрощённый порядок для индивидуальных жилых домов)
•
Арменпресс — Комитет по градостроительству об упрощённом порядке строительства домов (9 марта 2026)
•
Арменпресс — Комитет по градостроительству упростил строительство индивидуальных домов (13 марта 2026)
•
Комитет по градостроительству РА — разрешения на застройку через urban.e-gov.am
这篇文章有用吗?
#building permit
#private house
#urban.e-gov.am
Telegram
WhatsApp
Viber
Facebook
本文仅供参考。法律、收费标准和银行条件会变化 — 交易前请向公证人、地籍局、银行或税务机关核实细节。
目录
When you need a permitEverything goes through urban.e-gov.amThe standard procedure, step by stepThe simplified procedure from 1 June 2026How much it costs and how long it takesKey takeaways
Selling a flat?
Attach a Cadastre extract and get the “Verified” badge
Post for free

可能适合您

13 500 000 ֏
≈ $34 884
地块 · 7 公顷 · 迪利然
亚美尼亚的房产经纪人
21 200 000 ֏
≈ $54 780
地块 · 10 公顷 · 马拉蒂亚-塞巴斯蒂亚区
面向业主
13 300 000 ֏
≈ $34 367
地块 · 9 公顷 · 马拉蒂亚-塞巴斯蒂亚区
开发商:
13 800 000 ֏
≈ $35 659
地块 · 10 公顷 · 塞凡
亚美尼亚的中介机构

相关阅读

房屋与地块
房屋与地块
Part of a house: how to buy and register it
11 九月 · 4 分钟
房屋与地块
Yerevan suburbs: living in Kotayk, the pros and cons
8 九月 · 3 分钟
房屋与地块
Water, gas and electricity: how to check and connect utilities
5 九月 · 4 分钟